Difference between revisions of "Action items from 05/03/07 call"

From NCBO Wiki
Jump to navigation Jump to search
Line 7: Line 7:
 
*Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft.
 
*Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft.
 
   
 
   
*Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2.
+
*Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2).

Revision as of 10:55, 3 May 2007

Go back to CTO:Main Page


  • Review term lists and Jennifer’s shot at placing terms into OBI categories (download the May 3 excel file to manipulate the term lists and add your comments).
  • Re-generate OBI schematic based on current OBI version and come up with a permanent way to accurately synchronize the schematic with the current OBI draft.
  • Richard will send out email about upcoming workshop, including issues that need to be addressed (such as how we want others to contribute to CTO developoment in a controlled fashion), what we should present, and what we want to accomplish (especially on Day 2).